Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads

Belton Octal Socket VT8-PT, long leads

Product No.:
sk24
In stock. Delivery time depends on the destination country* In stock. Delivery time depends on the destination country*
RoHs:
conform
Weight:
0.02 kg per piece
2,75 €

incl. VAT excl. Shipping costs

Customers who bought this product bought also the following products:

Mallory 150's 0,0047 µF / 630 VDC
Mallory Type 150 is a general purpose capacitor for use in blocking, bypass, decoupling, smoothing and some timing applications.
  • Epoxy end fill meets UL94V-0
  • Non inductively wound
  • Flame retardant outer wrap meets UL510
  • Non polar
Specifications:
  • Operating Tempeature Range: –55 ºC to +125 ºC (derate linearly to 50% rated voltage at 125 ºC)
  • Dielectric Withstand Voltage: .6 x rated voltage for 2 s @ +25 ºC ±5 ºC
  • Dissipation Factor (DF): tgd x 10–4 at +25 ºC ±5 ºC
  • Insulation Resistance: 10,000 MO x µF, 30,000 MO Min.
  • Self Inductance: 1 nH max. per 1 mm lead and body length
  • Life Test: 1000 hrs @ 85 ºC 1.25 x Vn
  • Damp Heat Test: 95% RH @ +45 ºC for 21 days
  • Soldering: 260 ºC ±5 ºC for 10 s ±1 s
  • Long Term Storage Stability: ?C/C = ±3% after 2 years
1,50 €
EH 12AX7 / ECC83
The 12AX7EH provides high gain with ultra low noise and detailed, musical tone that rivals the most desirable NOS types.

Files:

19,80 €
F+T 15 µF @ 500 Volt, axial
  • Type: Aluminum Electrolytic Capacitors
  • Capacitance: 15 µF
  • Voltage Rating: 500 V
  • Tolerance: +/- 20%
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 16 mm x 30 mm
  • Termination Style: axial
2,55 €
JJ 40+20+20+20 µF @ 500 V
  • Type: Cancap
  • Capacitance: 40 + 20 + 20 + 20 µF
  • Voltage Rating: 500 V
  • Tolerance: -10 % / +30 %
  • Operating Temperature Range: - 25°C / + 70 °C
  • Dimensions: Ø 40 mm x 50 mm
  • Termination Style: radial, solder-lugs
18,25 €
CTS Potentiometer 250 kOhm linear, Knurled Shaft
Panel Mount Potentiometer
  • Power Rating: 0,3 W
  • Tolerance: 20%
  • Shaft: 6 mm, 24 teeth slot and knurled shaft
  • Shaft length: 6 mm
  • Drill Ø: 9,5 mm
  • Termination: Solder lugs
  • Dimension: 24 mm
Files
6,95 €
Orange Drop 716 0,047 µF @ 600 V

ORANGE DROP®, 716 P Series

  • Polypropylene Film Capacitors, extended foil
  • Voltage Rating: 600 V
  • Operating Temperature Range: - 55°C / + 85 °C
  • Termination Style: radial, copper leads
2,55 €
F+T 220 µF @ 350 Volt, axial
  • Type: Aluminum Electrolytic Capacitors
  • Capacitance: 220 µF
  • Voltage Rating: 350 V
  • Tolerance: - 10%+30%
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 25 mm x 38 mm
  • Termination Style: axial
6,65 €
Silver Mica 220 pF
Mica Capacitors
  • Voltage Rating:    500 V
  • Tolerance: 5%
  • Operating Temperature Range: - 50°C / + 150°C
  • Termination Style: radial
0,68 €