Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads

Socket Octal, 7/8", long leads

Product No.:
sk18
In stock. Delivery time depends on the destination country* In stock. Delivery time depends on the destination country*
RoHs:
conform
Weight:
0.02 kg per piece
1,95 €

incl. VAT excl. Shipping costs

Needed for:

Tung-Sol 6SN7 Reissue
Super linearity, low noise, and full performance ratings make this one of the best 6SN7 tubes ever made. The sound signature is on par with 5692 types. Excellent driver tube in high-end audio applications.
39,90 €
Psvane 6SN7GT / 6SN7
Psvane 6SN7GT
  • Drop in replacement for 6N8P 6H8C 6SN7 CV181
  • Very good price/performance ratio
24,80 €

Customers who bought this product bought also the following products:

EH 6V6 - SINGLE

Single tube, not matched

Rugged and wonderful-sounding Power Beam tetrode that performs flawlessly at up to 475 volts. Great replacement for single-ended amps such as Fender Champ, or high plate voltage amps like the Fender Deluxe Reverb.

• Specially developed cathode coating
• Tri-alloy plate material
• Carefully aligned grid

24,90 €